Hello
We are using BE2010R3 and we have locally attached volume on the machine which is being utilized as dedup storage.
The backup jobs currently doing backup to dedup folder and duplicate to tape library. And I also backup shadow copy components of media server to protect dedup folder for DR situations.
I saw one of the technical articles on reclaiming space manaully by running process queue and garbage collection with compaction commands manually. But while reading the article it mentions that the process queue runs every 12 hours (12.20pm and 12.20am) and on weekly basis garbage collection runs at 2.40am on sunday morning.
My concerns is what will happen to the backup jobs while the maintenance job runs do they increase the disk activity or the maintenance operation will not run untill unless I have no jobs running in job monitor. Becaue currently my shadow copy dedup backup is running at 1.5gb/min which used to run at 7gb/min.
Thanks everyone for reading this post