我需要解决方案
Dear All,
I used to have one full backup job that runs everyday and write tape to HP Tape drive.
HP tape drive is now replaced with HP 1/8 G2 autoloader (8 slots).
I got confused of how i can customize the daily backup job to run on different slot everyday(when job runs on Monday i need to write on slot 1, Tuesdya on slot 2 and so on)
is it means that i should have separate backup jobs (identical jobs) so i can configure each one to run on certain slot according to the day???
Kindly dvice