我需要解决方案
Hi
Using BE 2014 - i want to create:
For the first week - one full job for each day of the week
From the second week and on - one incrematel job for each day of the week.
Each day will have its own tapes.
When i configure the FULL jobs - i dont have an option to schduale the job to a specific time without hour/day/week/year interval.
I only have the options for spcific time with intervals, run now, no schduale.
I do have that option in the "One Time Backup" - but that way i can't configure the incremantal jobs for the second week and so on.
Am i missing something?
Thanks