我需要解决方案
I am running BE 2014 SP1.
After a backup I run two duplication jobs. I want to adjust the priority of these jobs.
I tried using the GUI to adjust the prority but this changed the priority of the backup job and left the duplication priority at medium. I want to adjust only the priority of the duplication jobs.
Is this possible, if so how?
Thanks
3439311